Torrent Power Ltd
Torrent Power Ltd Share Price Today: Live Updates & Key Insights
Get insights on Torrent Power Ltd’s fundamentals, financials, shareholding, peer comparison, corporate actions & performance. Track key metrics, price trends & market sentiment for informed decisions. Explore all data at Motilal Oswal.
Torrent Power Ltd Share Price Chart
Torrent Power Ltd Fundamentals
Traded Volume: 2,13,066
Market Cap(Cr): 64,560
Avg Traded Price 375.12
1 Year return -28.37%
Upper Circuit 1,288.4
Lower Circuit 1,258.4
P/E TTM 23.00
P/B Ratio 55.00
Traded Value(Cr) 2729.80
EPS TTM 54.528
Book value 54.528
Dividend 1.00%
Torrent Power Ltd Share Price Performance
Shows the percentage change in stock price over different time periods
This section highlights Torrent Power Ltd stock price performance across key timeframes, including 1-week, 1-month, 3-month, Year-To-Date (YTD), and 1-year returns. It provides insights into the Torrent Power Ltd share price history, short-term movements, long-term trends, and overall investor sentiment
1W -2.64%
1M +6.77%
3M -2.93%
1Y -28.37%
YTD -14.79%
Torrent Power Ltd Traded Volume Movement
Shows the trading volume over different time periods
This section highlights Torrent Power Ltd daily and average traded volumes, offering insights into investor activity and market liquidity. Higher volumes than average often indicate rising interest, news impact, or shifting market sentiment
Yesterday 6.76L
Day Before Yesterday 3.82L
1W Avg 5.44L
1M Avg 5.28L
3M Avg 5.70L
Torrent Power Ltd Technical Details
Torrent Power Ltd technical indicators, such as support and resistance levels and pivot points, are calculated based on historical price and volume trends. These metrics help traders anticipate possible price movements and make informed trading decisions.
Support 1 1264
Support 2 1246
Support 3 1234
Pivot Point : 1276
Resistance 1 1294
Resistance 2 1306
Resistance 3 1324
Torrent Power Ltd Corporate Actions
Torrent Power Ltd corporate actions include dividends, bonus issues, stock splits, and key company updates that may affect share price and investor sentiment. This section provides timely details on past and upcoming actions, including ex-date, record date, and payout ratio - helping investors make informed decisions based on Torrent Power Ltd’s capital allocation strategies.
All
Ex-Date 06-Jun-2025 Type D Description 5.00/share@50.00% Record Date 06-Jun-2025 Ratio 50.00
Ex-Date 12-Feb-2025 Type D Description 14.00/share@140.00% Record Date 12-Feb-2025 Ratio 140.00
Ex-Date 14-Jun-2024 Type D Description 4.00/share@40.00% Record Date 14-Jun-2024 Ratio 40.00
Ex-Date 16-Feb-2024 Type D Description 12.00/share@120.00% Record Date 16-Feb-2024 Ratio 120.00
Ex-Date 16-Jun-2023 Type D Description 4.00/share@40.00% Record Date 16-Jun-2023 Ratio 40.00
Ex-Date 22-Feb-2023 Type D Description 9.00/share@90.00% Record Date 22-Feb-2023 Ratio 90.00
Ex-Date 22-Feb-2023 Type D Description 13.00/share@130.00% Record Date 22-Feb-2023 Ratio 130.00
Ex-Date 10-Feb-2022 Type D Description 9.00/share@90.00% Record Date 11-Feb-2022 Ratio 90.00
Ex-Date 24-Jun-2021 Type D Description 5.50/share@55.00% Record Date 25-Jun-2021 Ratio 55.00
Ex-Date 16-Feb-2021 Type D Description 5.50/share@55.00% Record Date 17-Feb-2021 Ratio 55.00
Ex-Date 18-Feb-2020 Type D Description 11.60/share@116.00% Record Date 20-Feb-2020 Ratio 116.00
Ex-Date 13-Jun-2019 Type D Description 5.00/share@50.00% Record Date 14-Jun-2019 Ratio 50.00
Ex-Date 08-Jun-2018 Type D Description 5.00/share@50.00% Record Date 07-Nov-2025 Ratio 50.00
Ex-Date 08-Jun-2017 Type D Description 2.20/share@22.00% Record Date 07-Nov-2025 Ratio 22.00
Ex-Date 17-Mar-2016 Type D Description 4.50/share@45.00% Record Date 18-Mar-2016 Ratio 45.00
Ex-Date 11-Jun-2015 Type D Description 1.50/share@15.00% Record Date 07-Nov-2025 Ratio 15.00
Ex-Date 12-Jun-2014 Type D Description 0.50/share@5.00% Record Date 07-Nov-2025 Ratio 5.00
Ex-Date 13-Jun-2013 Type D Description 2.00/share@20.00% Record Date 07-Nov-2025 Ratio 20.00
Ex-Date 14-Jun-2012 Type D Description 3.50/share@35.00% Record Date 07-Nov-2025 Ratio 35.00
Ex-Date 25-Jan-2012 Type D Description 3.00/share@30.00% Record Date 27-Jan-2012 Ratio 30.00
Ex-Date 16-Jun-2011 Type D Description 2.50/share@25.00% Record Date 07-Nov-2025 Ratio 25.00
Ex-Date 16-Jun-2011 Type D Description 3.00/share@30.00% Record Date 07-Nov-2025 Ratio 30.00
Ex-Date 17-Jun-2010 Type D Description 3.00/share@30.00% Record Date 07-Nov-2025 Ratio 30.00
Ex-Date 18-Jun-2009 Type D Description 2.00/share@20.00% Record Date 07-Nov-2025 Ratio 20.00
Ex-Date 19-Jun-2008 Type D Description 1.20/share@12.00% Record Date 07-Nov-2025 Ratio 12.00
Ex-Date 23-Mar-2007 Type D Description 0.04/share@4.00% Record Date 26-Mar-2007 Ratio 4.00
Dividends
Announcement Date 06-Jun-2025 Ex Dividend Date 06-Jun-2025 Dividend(%) 50
Announcement Date 12-Feb-2025 Ex Dividend Date 12-Feb-2025 Dividend(%) 140
Announcement Date 14-Jun-2024 Ex Dividend Date 14-Jun-2024 Dividend(%) 40
Announcement Date 16-Feb-2024 Ex Dividend Date 16-Feb-2024 Dividend(%) 120
Announcement Date 16-Jun-2023 Ex Dividend Date 16-Jun-2023 Dividend(%) 40
Announcement Date 22-Feb-2023 Ex Dividend Date 22-Feb-2023 Dividend(%) 90
Announcement Date 22-Feb-2023 Ex Dividend Date 22-Feb-2023 Dividend(%) 130
Announcement Date 10-Feb-2022 Ex Dividend Date 10-Feb-2022 Dividend(%) 90
Announcement Date 24-Jun-2021 Ex Dividend Date 24-Jun-2021 Dividend(%) 55
Announcement Date 16-Feb-2021 Ex Dividend Date 16-Feb-2021 Dividend(%) 55
Announcement Date 18-Feb-2020 Ex Dividend Date 18-Feb-2020 Dividend(%) 116
Announcement Date 13-Jun-2019 Ex Dividend Date 13-Jun-2019 Dividend(%) 50
Announcement Date 08-Jun-2018 Ex Dividend Date 08-Jun-2018 Dividend(%) 50
Announcement Date 08-Jun-2017 Ex Dividend Date 08-Jun-2017 Dividend(%) 22
Announcement Date 17-Mar-2016 Ex Dividend Date 17-Mar-2016 Dividend(%) 45
Announcement Date 11-Jun-2015 Ex Dividend Date 11-Jun-2015 Dividend(%) 15
Announcement Date 12-Jun-2014 Ex Dividend Date 12-Jun-2014 Dividend(%) 5
Announcement Date 13-Jun-2013 Ex Dividend Date 13-Jun-2013 Dividend(%) 20
Announcement Date 14-Jun-2012 Ex Dividend Date 14-Jun-2012 Dividend(%) 35
Announcement Date 25-Jan-2012 Ex Dividend Date 25-Jan-2012 Dividend(%) 30
Announcement Date 16-Jun-2011 Ex Dividend Date 16-Jun-2011 Dividend(%) 25
Announcement Date 16-Jun-2011 Ex Dividend Date 16-Jun-2011 Dividend(%) 30
Announcement Date 17-Jun-2010 Ex Dividend Date 17-Jun-2010 Dividend(%) 30
Announcement Date 18-Jun-2009 Ex Dividend Date 18-Jun-2009 Dividend(%) 20
Announcement Date 19-Jun-2008 Ex Dividend Date 19-Jun-2008 Dividend(%) 12
Announcement Date 23-Mar-2007 Ex Dividend Date 23-Mar-2007 Dividend(%) 4
Bonus
No Bonus has been declared by TORNTPOWER
Splits
No Split has been declared by TORNTPOWER
Others
Rights No Rights has been declared by TORNTPOWER
Torrent Power Ltd Peer Comparison
Shows key financial metrics for the company and its peers
This section compares Torrent Power Ltd with leading peers in the banking sector based on key metrics such as market capitalization, 1-year return, P/E (TTM), and PB ratio. It helps investors evaluate Torrent Power Ltd's relative performance and valuation against major competitors.
Stock Name Tata Power Company Ltd ₹393.20 (+0.37%) M. Cap (Cr) 1256.41 1 Yr Return (%) -12.49% P/E (TTM) 30.95 PB Ratio 3.73
Stock Name Adani Energy Solutions Ltd ₹960.60 (-0.78%) M. Cap (Cr) 1153.95 1 Yr Return (%) -10.75% P/E (TTM) 51.16 PB Ratio 5.50
Stock Name JSW Energy Ltd ₹519.15 (+0.35%) M. Cap (Cr) 907.35 1 Yr Return (%) -23.95% P/E (TTM) 44.84 PB Ratio 3.24
Stock Name Torrent Power Ltd ₹1281.20 (+0.63%) M. Cap (Cr) 645.60 1 Yr Return (%) -28.37% P/E (TTM) 23.50 PB Ratio 4.84
Stock Name NLC India Ltd ₹258.25 (-0.65%) M. Cap (Cr) 358.10 1 Yr Return (%) -1.15% P/E (TTM) 13.71 PB Ratio 2.02
Stock Name CESC Ltd ₹174.75 (-0.48%) M. Cap (Cr) 231.64 1 Yr Return (%) -6.38% P/E (TTM) 15.98 PB Ratio 1.92
Stock Name Nava Ltd ₹573.10 (-3.74%) M. Cap (Cr) 166.31 1 Yr Return (%) +14.01% P/E (TTM) 18.03 PB Ratio 2.25
Torrent Power Ltd Cash Flow
Cash flow data provides a view of how money is generated and spent by Torrent Power Ltd, across its operating activities, investing activities, and financing activities.
PARTICULARS Operating Activities Mar 2025 4277.91 Mar 2024 3413.69 Mar 2023 3117.59 Mar 2022 2980.80 Mar 2021 2670.42
PARTICULARS Investing Activities Mar 2025 -2880.16 Mar 2024 -3187.06 Mar 2023 -2137.39 Mar 2022 -2512.24 Mar 2021 -595.09
PARTICULARS Financing Activities Mar 2025 -1438.26 Mar 2024 -101.05 Mar 2023 -1003.91 Mar 2022 -402.32 Mar 2021 -2058.86
PARTICULARS Net Cash Flow Mar 2025 -41.24 Mar 2024 125.58 Mar 2023 -23.71 Mar 2022 66.24 Mar 2021 16.13
Torrent Power Ltd Shareholding Pattern
This shows the ownership breakdown of Torrent Power Ltd, highlighting participation from Foreign Institutional Investors (FII), Mutual Funds, Public, Other Institutions, and Promoters.
Promoter 51.09%
Public 9.6%
Other Institutions 14.33%
FII 8.82%
Mutual Funds 16.18%
About Torrent Power Ltd
Torrent Power Limited is an integrated power utility and is one of largest private sector players in India having interests in power generation, transmission, distribution and manufacturing and supply of power cables. It has a portfolio of coal based, gas based and renewable power plants with an aggregate operational generation capacity of 7,992 MWp with a unique mix of coal based, gas based, and renewable power plants that use highly efficient power generation technologies. Company currently operates 355 km of 400 kV double circuit transmission lines and 128 km of 220 kV double circuit transmission lines for transmission of power generated at our gas-based power plants to various off-take centres.Torrent Power Limited was incorporated on April 29, 2004 as a Private Limited Company with the name 'Torrent Power Trading Pvt. Ltd.' In January 25, 2006, name of the company was changed to Torrent Power Private Limited. In February, 2006, Company converted into Public Limited Company and the name was changed to Torrent Power Limited. In the year 2006, as per the Scheme of Amalgamation, Torrent Power AEC Ltd, Torrent Power SEC Ltd and Torrent Power Generation Ltd were amalgamated with the Company with effect from April 1, 2005. In October 19, 2006, Torrent Power Grid Ltd (erstwhile Torrent Power Transmission Pvt Ltd), a joint venture company with Power Grid Corporation of India Ltd became a subsidiary of the company. In December 20, 2006, the company signed a distribution franchise agreement with Maharashtra State Electricity Distribution Company Ltd for the Bhiwandi circle in Maharashtra for a period of ten years. In January 26, 2007, the company commenced Distribution Franchise for Bhiwandi circle of Maharashtra State Electricity Distribution Company Ltd catering to 1.4 lakh customers with an unrestricted demand of about 700 MW. In May 2007, the company signed a memorandum of understanding (MoU) with Gujarat Power Corporation for setting up over 1000-MW coal based power project at Pipavav, Amreli Dist in Gujarat. During the year 2007-08, the company added 321 Distribution Transformers of 11 kV at Ahmedabad, Gandhinagar and Surat. They also commissioned the first phase of 220 kV Transmission Lines project at Surat. In September 25, 2007, the company formed a subsidiary company, namely Torrent Pipavav Generation Ltd for the development of coal based thermal project.During the year 2008-09, the company added 352 Distribution Transformers of 11 kv at Ahmedabad, Gandhinagar and Surat. The company's subsidiary, Torrent Power Grid Ltd, a joint venture with PGCIL, commissioned the first phase of evacuation arrangement by construction of 26 km Jhanor-Vapi LILO line. The company also installed and commissioned transmission lines to connect SUGEN plant with 220 kv Kim sub-station of GETCO. During the year, the company was awarded the Distribution Franchise to Agra and Kanpur Distribution Circles for a period of 20 years. In September 2008, the company formed Torrent Power Bhiwandi Ltd (formerly known as Torrent Power Distribution Services Ltd) as a subsidiary company for providing infrastructural and manpower support for Bhiwandi operations of the company.In October 2008, the company entered into a Power Purchase Agreement with Gujarat Paguthan Energy Corporation Pvt Ltd for supply of 49.6 MW wind power. Simultaneously, the company is also evaluating the establishment of their own wind and solar power generation. In March 2009, Torrent Energy Ltd became a subsidiary of the company, which is formed for setting up a 1500 MW gas based combined cycle power plant in Dahej SEZ. The company signed Fuel Supply Agreement (FSA) with South Eastern Coalfields Ltd, a subsidiary of Coal India Ltd, for meeting requirements of their coal based generating station at Sabarmati. The FSA is effective for a period of 5 years from April 1, 2009. In May 2009, the Uttar Pradesh Power Corporation Ltd (UPPCL) has entered into an agreement with the company for power distribution in Kanpur and Agra.During the year 2009-10, the company signed the shareholders' agreement with Gujarat Power Corporation Ltd for implementation of the 1000+ MW Coal-Based Power Project at Pipavav, Dist. Amreli, Gujarat. Torrent Power Grid Ltd, a subsidiary company commissioned the second phase of power transmission line (80 km. double circuit 400 kV transmission lines) i.e. Gandhar-Dehgam Loop in Loop out (LILO) at SUGEN to facilitate power supply from SUGEN to Ahmedabad.In August 15, 2009, the company fully commissioned their ambitious SUGEN Mega Power Project. In September 30, 2009, the company commissioned 1147.5 MW SUGEN Mega Power Project and was dedicated to the nation. The company was awarded the distribution franchise for Agra and Kanpur distribution circles for a period of 20 years. They commenced distribution operations at Agra from April 1, 2010.Torrent Energy Limited (TEL) became the Distribution Licensee for Dahej SEZ and in April 4, 2010, they commenced the distribution of power.During the year 2010-11, the company divested their shareholding from Torrent Power Bhiwandi Ltd (TPBL). TPBL, therefore, ceased to be a subsidiary of the company. The Company commenced distribution franchisee operations at Agra effective from April 1, 2010. The company forayed into the thrust area of renewable energy by conceptualizing the 44 MW wind power generation project. They signed an agreement with Enercon (India) Ltd to commission this project at Lalpur, District Jamnagar, Gujarat. The company signed an MoU with the Government of Uttar Pradesh for development of 1,320 MW Coal Based Power Plant at Sandila, Dist. Hardoi, Uttar Pradesh which is in its initial stage of development. During the year 2010-11, Torrent Power Grid Limited, a subsidiary of the Torrent Power Limited, commissioned the third and final phase of 144.5 kms, 400 kV Double Circuit line, part of transmission infrastructure from SUGEN Generating Station to Pirana sub-station of PGCIL with Loop in Loop out (LILO) at 400 kV sub-station of the company at Pirana . From 1 April 2010, Torrent Power commenced operations as distribution franchise for Agra circle, Uttar Pradesh. On 2 July 2010,Torrent Power and its subsidiary Torrent Energy Limited awarded EPC contract to Siemens for implementing UNOSUGEN (382.5 MW combined cycle gas based Power Plant at its existing SUGEN Plant's location) and DGEN (1200 MW combined cycle gas based Power Plant at Dahej SEZ) respectively. Torrent Energy Limited became the Distribution Licensee for Dahej SEZ and distribution of power commenced on 4 April 2010.During the year 2010-11, the 382.5 MW UNOSUGEN, the brown field expansion to SUGEN Power Plant, received Mega Power Project Status from the Ministry of Power, environmental clearance from MoEF and connectivity approval from Central Transmission Utility. During the year under review, the central transmission utility granted connectivity and Long Term Open Access for 1200 MW DGEN Power Plant.On 22 March 2012, Torrent Power successfully commissioned its first 49.6 MW Wind Power Plant at Lalpur, District Jamnagar, Gujarat. On 10 April 2012, the Ministry of Commerce & Industry granted Torrent Energy Limited the status of Co-Developer at Dahej SEZ area. On 28 November 2011, 1196.85 DGEN Power Project obtained provisional Mega Power status by Ministry of Power, Govt. of India. During the year 2011-12, Torrent Energy Limited successfully implemented the 400 kV Double Circuit Transmission line with triple snowbird conductor from DGEN Generating Station to PGCIL's Navsari Sub-station for Connectivity with the Inter-state Transmission System.On 30 April 2013, the company successfully uprates the 110 MW coal based F station of AMGEN (the 422 MW coal based power plant) to 121 MW and synchronises the same with the grid. On 21 October 2013, the company successfully uprates the 110 MW coal based E station of AMGEN, to 121 MW and synchronises the same with the grid. During the year 2013-14, DGEN (the 1200 MW combined cycle gas based Power Plant at Dahej SEZ) and UNOSUGEN (the brown field expansion to SUGEN Power Plant) were successfully registered with United Nations Framework Convention on Climate Change under the Clean Development Mechanism. During the year under review, Torrent Power put into commercial operation the 382.5 MW UNOSUGEN Power Project.During the year 2014-15, Torrent Power successfully commissioned the 1200 MW DGEN Power Project at Dahej SEZ, District Bharuch, Gujarat. During the year under review, Torrent Power commissioned the 51 MW Solar Photovoltaic (PV) Power Plant at the Charanka Solar Park in Gujarat.Torrent Energy Limited and Torrent Cables Limited got merged with Torrent Power Limited with effective date of 1 October 2015 and appointed date of 1 April 2014 pursuant to the order of the High Court of Gujarat sanctioning the Composite Scheme of Amalgamation. During the year 2015-16, Torrent Power inked an agreement for regasification and storage capacity with Petronet LNG Limited up to 1 MMTPA for 20 years starting from April 2017. During the year under review, Torrent Power successfully commissioned the 81 MW GENSU Solar Power Project adjacent to SUGEN Plant in a cost effective manner.During the year under review, Torrent Power awarded EPC contract to Suzlon Energy Limited for implementing 201.6 MW Wind Power Project in Kutch and Bhavnagar districts in Gujarat. It also awarded EPC contract to M/s. Wind World India Ltd. for implementing 136.8 MW Wind Power Project in Rajkot and Surendranagar districts in Gujarat.The Board of Directors of Torrent Power Limited at its meeting held on 18 May 2016 approved the draft Scheme of Arrangement between Torrent Solargen Limited (TSL) (formerly known as Torrent Power Bhiwandi Limited), the wholly owned subsidiary of the company and Torrent Power Limited (TPL). The Scheme provides for the transfer and vesting of the solar and wind energy undertakings of TSL to the TPL on a going concern basis by way of slump sale for a lumpsum cash consideration of Rs 80.63 crore with effect from the appointed date of 1 April 2015. On 14 February 2018, Torrent Power Limited announced that the company has entered into a contract with Siemens Gamesa Renewable Power Private Limited for setting up of wind power projects upto the aggregate capacity of 120 MW. The arrangement includes acquiring of the 100% share capital of the two SPVs established for the purpose of development and implementation of the said projects at Rs 1 lakh each from Siemens Gamesa Renewable Power Private Limited.On 7 March 2018, Torrent Power Limited announced that the company participated in the competitive bidding process, followed by the Reverse E-Auction process held on 6 March 2018 by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for procurement of power on long term basis from 500 MW grid connected wind power projects, and emerged as a winner in the auction for setting up of 124.4 MW project. The said capacity of 124.4 MW will be developed in the state of Maharashtra. The project shall be commissioned within 18 months from the date of execution of the PPA, as specified by MSEDCL.On 26 September 2018, Torrent Power Limited announced that the company participated in the competitive bidding process (by way of E-reverse auction process) conducted by Solar Energy Corporation of India Ltd. (SECI) on 25 September 2018 for setting-up of 1200 MW ISTS connected wind power projects and emerged as one of the winning bidders for capacity of 115 MW project.As of FY 2020-21, Company had executed renewable projects, aggregating to around 787 MW, spanning solar and wind energy.During the year 2020-21, the Scheme of Arrangement was formed between the Company and TCL Cables Pvt. Ltd., a wholly owned subsidiary of the Company, for transfer and vesting of its Cables Business Undertaking on a going concern basis, with effect from the appointed date being April 01, 2020, for a cash consideration of Rs. 256.95 Crore, which was approved by the National Company Law Tribunal (NCLT), Ahmedabad Bench vide its Order dated December 17, 2020 and Scheme became operative w.e.f. January 15, 2021.During the year 2021-22, Company acquired 51% stake in power distribution company of Dadra & Nagar Haveli and Daman & Diu Union Territory spanning an area of 603 sq. kms, which was taken over with effect from April 1, 2022. It expanded Renewable Energy portfolio (both solar and wind) by acquiring 231 MW of additional capacities, which grew to 1,018 MW and expanded reach to States like Rajasthan and Madhya Pradesh. It commissioned an additional 66 kV cable connectivity between the Puna and AK Road (K) substation and the Bhatar and Kailash Nagar (H) substation at Surat. It replaced old and obsolete networks including paper-insulated lead-covered (PILC) cable with cross-linked polyethylene (XLPE) cable, T-jointed/ LC wire network with XLPE cable network etc. It acquired three renewable projects in line to strengthen renewable business, to expand their operational renewable portfolio by 231 MW, including 156 MW of wind and 75 MW of solar.During the year 2023, the Company added an additional 50 MW capacity, taking the total acquired capacity to 281 MW and the total operational capacity to 1,068 MW. It acquired 50 MW Solar Power Plant at Kamareddy, Telangana. It acquired 100% of the share capital and all securities of Sunshakti Solar Power Projects Private Limited (SSPPPL) and 100% Equity Share Capital of Wind Two Renergy Private Limited (WTRPL). The 27 MW Wind Power Project was commissioned on May 27, 2023.The Company acquired 100% equity stake of Solapur Transmission Limited (STL), making it a wholly owned subsidiary of the Company w.e.f. March 20, 2024. With commissioning of 115 MW wind power project, 35 MWp solar capacity under C&I segment, the total operational renewable generation capacity of the Company reached 1,236 MWp (315 MWp Solar and 921 MWp Wind) which is tied up under long-term PPAs. 275 kWp Rooftop Solar Plant was installed at SUGEN in 2024.In 2025, Company's total generation capacity including under construction capacity stood at ~7,992 MWp, with renewable energy capacity at ~4,900 MWp i.e. ~61% of total capacity. The gas-based thermal plants - SUGEN, UNOSUGEN, and DGEN - operated at modest levels, which was offset by increased merchant and bilateral sales, including NVVN tenders and Section 11 imposed by government for gas-based power plants. These plants played a crucial role in meeting peak demand and maintaining grid stability. The AMGEN coal-based plant met supply obligations in the licensed distribution area. In renewables, Company commissioned a 510 MWp solar capacity, bringing total operational renewable capacity to 1,746 MWp. Additionally, it signed major agreement with Maharashtra State Electricity Distribution Company Limited (MSEDCL) to supply 2,000 MW/ 16,000 MWh through Pumped Hydro Storage.
Chairman Emeritus
Sudhir U Mehta
Registered office Samanvay 600 Tapovan, Ambawadi, Ahmedabad, Gujarat, 380015
FAX :91-79-26628300/26628000
Background
Incorporation Year 2004
Face Value ₹10.00
Market Lot 1
FAQs on Torrent Power Ltd
How to buy Torrent Power Ltd shares on NSE?
To buy Torrent Power Ltd shares in Motilal Oswal, you just need to open a demat account and get your KYC documents verified.
What is the Torrent Power Ltd share price today?
The Torrent Power Ltd share price on NSE is ₹1281.20 today.
What is the market cap of Torrent Power Ltd on NSE?
The company has a market capitalization of ₹64560.12.
What is the PE & PB ratio of Torrent Power Ltd?
PE is 23 and PB is 55.
What is the 52 Week High and Low of Torrent Power Ltd shares?
Torrent Power Ltd stock price high: ₹1798 Torrent Power Ltd stock price low: ₹1188.